Norwegian Trollstigen Switchback Relay
Team BuildingObstacle Course
N
PLAYERS
6+
DIFFICULTY
SETTING
Outdoor
MATERIALS
- Cones to mark a zigzag path
- A baton or small object to relay
MEASUREMENTS
Zigzag course roughly 30-50ft (9-15m) long with 5-6 turns.
HOW TO PLAY
1
Set up cones in a tight zigzag pattern to represent a winding mountain road.
2
Split into teams that line up at the base of the course.
3
The first runner weaves through every switchback turn without cutting across, then races back.
4
The runner hands off the baton to the next teammate the instant they return.
5
The first team to cycle every runner through the full zigzag wins the relay.